Weekly Road Construction Report

Thursday, June 21, 2018

Here is the weekly road construction report for Hamilton County

I-75 North Exit 1 interchange reconfiguration project at mile marker 1:   Work on this project continues. There is now only one exit ramp that allows drivers to turn both east and west on Ringgold Road at a signalized intersection. Traffic has been shifted onto the newly constructed portion of Camp Jordan Parkway, and the intersection (I-75 NB off-ramp and SR-8/Camp Jordan Parkway) is now controlled by a traffic signal. Estimated project completion date is June. [C.W. Matthews Contracting/City Of East Ridge/LCLPRGM]  

US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues. Motorists can expect nightly closures on MLK Blvd. beginning Monday through Wednesday. These closures will be in place between the hours of 7 p.m.-6 a.m. for the installation of new storm drainage pipes across MLK Boulevard. During the work the following Ramps at the US-27/MLK Boulevard interchange will also be closed. Ramp from WB MLK to SB US-27, Ramp from EB MLK to NB US-27, and Ramp from SB US-27 to EB MLK Blvd. The MLK traffic can detour using either Broad or Chestnut Street to 6th Street to Gateway Boulevard. Alternate access points to SB US-27 are Main Street or 4th Street, and the alternate access to NB US-27 will be at 4th Street. The 12th Street tie-in ramp to US-27 South has been temporarily closed. This closure will be in place through Sept. 18. Detours are posted. Motorists should exercise caution when traveling through the construction zone and pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. THP will assist with traffic control on the project as necessary.  Estimated project completion date is January. [Dement Construction Company, LLC/Micka/CNP230]  

Utility Work on SR-153 (State Highway 153) northbound from LM 9.25 to LM 9.20:   NB on Highway 153 between Hixson Pike and Northpoint Boulevard. Install gas main. Flaggers and flagger signage will be present. June 25-July 6 from 9 a.m.-3 p.m. 

Utility Work on SR-320 (E. Brainerd Road) westbound from LM 2.05 to LM 2.05:   WB on E. Brainerd road between N Concord oad and Rowewood Drive. Retire gas service to 7025 E Brainerd Road. Signage, warning devices and flaggers will be present. June 23-30, 9 a.m.-3 p.m.

Utility Work on SR-321 (Ooltewah-Ringgold Road) northbound from LM 3.93 to LM 3.93:   NB on Ooltewah Ringgold Road between Thornberry Drive and Bennie Lane. Retire Gas service to 3705 Ooltewah Ringgold Road. Reduce speed, flaggers and flagger signage will be present. June 23-30, 9 a.m.-3 p.m. 

Utility Work on SR-8 (Taft Highway) northbound from LM 22.66 to LM 22.86:   NB on Taft Highway between Stewart Road and Corral Road. Gas main for new subdivision. Flaggers and flagger signage will be present. June 18-Aug. 17, 9 a.m.-3 p.m.

SR-111 resurfacing from SR-29 to Jones Gap Road:   During this report period the contractor will have lane closures in place during resurfacing operations. No closures will occur from 5-8 a.m. in the southbound direction and from 4-6 p.m. in the northbound direction. Flaggers will be on hand to assist as needed. Estimated project completion date is July. [Wright Brothers, LLC/Pruett/CNS020]  

SR-320 (East Brainerd Road) grading, drainage, installation of signals, construction of seven retaining walls and paving from east of Graysville Road to east of Bel-Air Road:   During this report period, the contractor will have intermittent lane closures between 9 a.m.-2 p.m. This work may affect either direction of East Brainerd Road or side streets from Graysville Road to Bel-Air Road. Flaggers will assist with traffic control as needed.  The contractor intends to shift traffic to final alignment from Morris Hill Road to just East of Banks Road on Wednesday and put the traffic signal at Banks into service. The result will be two travel lanes in either direction, one center turn lane and bike lanes in either direction from Morris Hill Road to just East of Banks Road.  Estimated project completion date is June. [Jones Bros. Contractors, LLC/Pruett/CNN383] 

The tunnel cleaning of the McCallie Tunnel on US-11 (US-64, SR-2), the Stringers Ridge Tunnel on US-127 (SR-8), and the Bachman Tubes on US-41 (US-76, SR-8):   The nighttime cleaning operation of McCallie Tunnels, Stringers Ridge Tunnel, and Bachman Tubes occurs between 8 p.m.-6 a.m. Tunnels will be closed during cleaning and detours will be marked accordingly, as each tunnel is cleaned. This work is scheduled to begin on Wednesday at the McCallie tunnels (SR-2) and proceed to the Stringer's Ridge tunnel (SR-8) and on Thursday the Bachman Tubes (SR-8) will be cleaned.  Estimated project completion date is June. [ETI Environmental, Inc./Micka/CNR223] 




East Ridge Back The Blue BBQ And Bake Sale Today

Hosted by First Annual ER Police Local 735 IBPO, Back the Blue BBQ and Bake Sale is going on today from 11 a.m.-5 p.m. at Camp Jordan Park, 323 Camp Jordan Pkwy. in East Ridge. Tickets can be purchased at one of 2 places:  Broomes Wrecker Service: 4003 Ringgold Road (see Alisha), or The Market Link Gift Shop, 4103 Ringgold Road (see Crystle).  Tickets are $8 ... (click for more)

Poplar Springs Road In Catoosa County To Be Closed July 15-16

The Catoosa County Public Works Department has scheduled road repair and storm drain replacement work on Poplar Springs Road between Three Notch Road and Talley Circle. It will be closed to thru traffic beginning Sunday, at 7 p.m. through Monday, at noon, weather permitting. The detour route will be marked. Catoosa County officials appreciate the patience and cooperation ... (click for more)

5 People Shot On Cowart Street Early Sunday Morning

Five people were shot on Cowart Street early Sunday morning.   At approximately 2:55 a.m., Chattanooga Police responded to the area of 1400 Cowart Street on reports of multiple people shot. The shooting was near Coyote Jack's where one person was killed and another injured in a shooting in December 2017.   Upon arrival, police found several ... (click for more)

Body Of Robert Townsend, 60, Found In Dumpster On Laura Street

The body of Robert Townsend, 60, was found on Friday in a dumpster on Laura Street.   At approximately  11:19 a.m. , Chattanooga Police were dispatched to a deceased party in the 2500 block of Laura Street. Upon arrival, officers located the body inside the bin.     Violent Crimes Bureau responded to the scene. The decedent was transported to the ... (click for more)

Remembering Barry Parker

The news came like a thunderclap, jolting and unexpected…followed by that painful silence awaiting a clash of lightning and the dreadfully long hours of solemn rain. “Did you hear that Barry passed away,” read the message from our mutual friend John Wilson. Not “Barry Parker,” but just “Barry.” John could have sent that message to hundreds of people and they would have instantly ... (click for more)

Roy Exum: The Saturday Funnies

(Roy Exum took a fall, on his newly-operated knee on Friday, and will be out for a few days. This is one of his Saturday Funnies from a few months ago.) It is purported that “The Letter from The Sick Bed” came from the hand of Steve Jobs, CEO of Apple, and while I can find no evidence this is true, its message is one we should never ignore in this week’s version of “The Saturday ... (click for more)